SERVICES WE PROVIDE
Concept Description Price
Mobile Home Permit Depending on the county it takes from 1-2 months $2,500
Septic Permit We usually handle the septic permit with the Health Department to avoid any delays $850
Delivery 1 -3 days after home is built $5,000 - $7,000
Mobile home installation Block and ties, set up and anchoring $12,000
Mobile Home Construction 4-5 weeks from order to delivery to the lot from the day of initial deposit


INTERACTIVE CALCULATOR
COSTS PROJECTED COSTS DESCRIPTION
VARIABLE Septic installation.
VARIABLE These prices range between $8,000 - $10,000 depending on the location and size of the home.
VARIABLE RANGE BETWEEN $4,500 AND $6,500 depending on the location and how deep the well is.
VARIABLE Varies depending on the lot but usually ranges from $2,000 to $6,000.
VARIABLE Anywhere from $500 to $1,000 depending on location and whether you need a boundary or topographic survey.
VARIABLE This is the fees from the county charged when you pull permits. Varies by county.
VARIABLE Fee from the county permit office.
FIXED Depends on the unit type you are installing.
FIXED Ranges from $5,000 to $7,000 in Florida. Remember these homes come from out of state.
FIXED Typically $12,000. This includes setting up the home on crawlspace and putting it together.
FIXED This is what we charge to process the permits with the county.
FIXED This is what we charge to process the permits with the health department.
FIXED Soil test required for the septic permit.
FIXED This includes installing the meter can and connecting the wires from the meter to the house, the AC is supplied with the house.
FIXED This is what we charge to build the stairs.
FIXED Interior finish work.
FIXED Usually they do not require driveways but in the event a county requires it they can range from $3,000 - $7,000.
FIXED In the event you want to install grass or mulch at the house.
FIXED This is what you need to set the house up. This is clay and you will need at least 2 loads to set the house. Varies between $300 to $500 per load.
FIXED Fence for the property.
FIXED Clean up house and lot after installation.
FIXED Termite treatment for soil.
FIXED Sign number for the lot.
FIXED Mail box for the lot.
FIXED Install clean sticker.
FIXED Delete title.
TOTAL $0
Projected Sales Price
3% Realtor + 2% CC $0
Projected Margin $0