top of page

SERVICES WE PROVIDE

Concept
Description
Price
Mobile Home Permit
Depending on the county it takes from 1-2 months
$2,500
Septic Permit
We usually handle the septic permit with the Health Department to avoid any delays
$850
Delivery
1 -3 days after home is built
$5,000 - $7,000
Mobile home installation
Block and ties, set up and anchoring
$12,000
Mobile Home Construction
4-5 weeks from order to delivery to the lot from the day of initial deposit

INTERACTIVE CALCULATOR

COSTS
PROJECTED
COSTS
DESCRIPTION
VARIABLE
Lot
Septic Installation.
VARIABLE
Septic Installation
These priuces range between $8,000 - $16,000 depending on the location and size of the home.
VARIABLE
Well Installation
RANGE BETWEEN $6,500 AND $15,000 depending on the location and how deep the well needs to be.
VARIABLE
Lot Clearing
Varies depending on the lot but we typically stay away from lots that need a lot of clearing.
VARIABLE
Survey
Anywhere from $350 to $1,500 depending on location and whether you need a boundary survey ot topographical survey.
VARIABLE
Impact Fees
These are the fees from the county or city that need to be paid. Be sure to ask the county to find out how much they are and if they have been paid by the previous owner. When there was an existing structure on the lot these fees can be waived.
VARIABLE
County Permit Fees
Fees from the county department.
FIXED
Mobile Home
Depends on the unit you are installing.
FIXED
Delivery
Ranges from $5.000 to $7,000 in Florida. Remember these homes come from Georgia.
FIXED
Installation
Typically $12,000. These includes Setting up the home on crwalspace and putting it together.
FIXED
Building Permit
These is what we charge to process the permit with the county.
FIXED
Septic Permit
Thes is what we charge to process the permit with the health department.
FIXED
Soil Test
Thes is what the health department requires to figureout which type of septic you need.
FIXED
A/C Unit
These homes come with all the Ducts but they do not come with the Unit. These units are Package Units and ranges from $5,000 to $7,000
FIXED
Electric Hook Up
This includes installing the meter can and connecting the electric from the meter to the house, the A/C, Septic and well to the houser.
FIXED
Stairs
Thes is what we charge to process the permit with the health department.
FIXED
Interior Finish
FIXED
Driveway
Usually they do not require driveways but in the event a county requires it they can range from $3,500 - 7,000
Landscape
In the event you want to install gracss or mulch to the house.
Loads of Dirt
This is what you need to set the house up - This is Clay and you need at lease 2 loads to set the house. Varies between 300 to 500 per load.
License Fees
Clean Up House
Grading Lot
Termite Treatment for Soil
911 number
Mail box
Staging
Install Green Sticker
Retire Title

TOTAL

$

0

Projected Sales Price

$

3% Realtor + 2%CC

$

0

Projected Margin

$

0

bottom of page